Foreign flagged ships detained in the UK during March 2021
May 10, 2021 Maritime Safety News
During March, there were zero new detentions of foreign flagged vessels in a UK port.
- In response to one of the recommendations of Lord Donaldson’s inquiry into the prevention of pollution from merchant shipping, the Maritime and Coastguard Agency (MCA) publishes details of the foreign flagged vessels detained in UK ports each month.
- The UK is part of a regional agreement on port state control known as the Paris Memorandum of Understanding on Port State Control (Paris MOU) and information on all ships that are inspected is held centrally in an electronic database known as THETIS. This allows the ships with a high risk rating and poor detention records to be targeted for future inspection.
- Inspections of foreign flagged ships in UK ports are undertaken by surveyors from the Maritime and Coastguard Agency. When a ship is found to be not in compliance with applicable convention requirements, a deficiency may be raised. If any of their deficiencies are so serious, they have to be rectified before departure, then the ship will be detained.
- All deficiencies should be rectified before departure.
Notes on the list of detentions:
- Full details of the ship: The accompanying detention list shows ship’s International Maritime Organisation (IMO) number which does not change throughout the ship’s life and uniquely identifies it. It also shows the ship’s name and flag state at the time of its inspection.
- Company: The company shown in the vessel’s Safety Management Certificate (SMC) or if there is no SMC, then the party otherwise believed to be responsible for the operation of the ship at the time of inspection.
- Classification society: The list shows the classification society responsible for classification of the ship only.
- Recognised organisation: Responsible for conducting the statutory surveys and issuing statutory certificates on behalf of the flag state.
- White (WL), grey (GL) and black lists (BL) are issued by the Paris MoU on 01 July each year and shows the performance of flag state.
- Deficiencies: The deficiencies listed are the ones which were detainable. Further details of other deficiencies can be provided on request.
Source: gov