The CBG 500 E crane combines drive technologies with Liebherr’s own crane control system “Master V”.

Another highlight is the energy recovery system LiCaTronic®, which makes optimum use of the energy available.

The new all-electric crane CBG 500 E expands the transshipment solutions portfolio with a reliable machine that offers a handling performance of up to 2,000 tonnes per hour.

The all-electric drives inside the crane in combination with the supercapacitors turn the rope luffing CBG 500 E into a unique handling solution in the market.

The supercapacitors used as standard in Liebherr’s own LiCaTronic® energy recovery system support the increasing requirements regarding energy efficiency.

The boom of the CBG 500 E was designed as a lattice boom. This makes it particularly stiff and light, which further improves the turnover performance and at the same time reduces the energy need.

The result is a lifting capacity of up to 105 tonnes in hook operation and a maximum grab capacity of up to 90 tonnes.

The extension of the cabin and the high positioning ensure that the crane operator has an optimal viewing angle of all processes. The crane operator is supported operationally by the new, integrated “Master V” crane control system.

Together with a more efficient software architecture, it forms the basis for integrating future assistance and automation systems into the crane in the long term.

The crane can be configured with 43 metre and 50 metre boom. The longer boom variant offers the decisive advantage of enabling direct transshipment between two vessels in sheltered and open water.

The modes of operation range from bulk to container handling and are independent of the area of operation.

For installation on a barge, the crane can be equipped with additional counterweights, enabling safe cargo handling. Optional configuration options such as a comfort ascent or additional platforms and boom walkways for maintenance purposes can also be configured.

Source: https://www.porttechnology.org/news/liebherr-unveils-first-all-electric-transshipment-crane/

 

CREWEXPRESS STCW REST HOURS SOFTWARE - Paris and Tokyo MoU have announced that they will jointly launch a new Concentrated Inspection Campaign (CIC) on Standards of Training, Certification and Watchkeeping for Seafarers (STCW) from 1st September 2022 to 30th November 2022


Company DETAILS

SHIP IP LTD
VAT:BG 202572176
Rakovski STR.145
Sofia,
Bulgaria
Phone ( +359) 24929284
E-mail: sales(at)shipip.com